Page 1 of 2
Exhibit Gallery
Conrail’s Nasby Interlocking Tower (Control Point CP 292- milepost)
TTRR crossing with crossovers between the mains, Photo 2
East-west Conrail main line, view from tower steps, Photo 3
Operator's Office on the second floor, Photo 4
Switch Machine, Photo 5
Switch Machine with interlocking diagram, Photo 6
Close-up view of the interlocking diagram, left side, Photo7
Interlocking diagram, right side, Photo8
Black and white handles controlling the switches and signals, Photo 9
Route-Switch table, Photo 10
Switches 56, 28, and 27, Photo 11
Westbound multi-level train dropping off cars at the Mega-Terminal, Photo 12
Westbound freight train going by the maneuver, Photo 13
Eastbound TV train headed for the Mega-terminal, Photo 14
Westbound freight with a Conrail engine, Photo 15
Eastbound double-stack container train appeared , Photo 16
Westbound train and maintenance truck, Photo 17
Amtrak and freight trains side by side, Photo 18
Trains accelerating beyond the 50 mph speed limit, Photo 19
Petroleum versus Nasby political cartoon
David Ross Locke
Stanley Tower (CSX)